top of page

Project Portfolio

Cressy-Media-Release-Photo-Savannah-lr.jpg
Enerven / Electranet

Engineering & Design

images.jpg
Skills Lab - Sage Automation

Training & Advisory

Mott_MacDonald_002-2-1-800x650.jpg
Mott Macdonald

Training & Advisory

images (1).jpg
​FYFE

Engineering & Design / CAD & Modelling

Murra_Warra_Wind_Farm.jpg
Enerven / Sqaudron Energy

Engineering & Design / Digital Engineering / CAD & Modelling / Reality Capture

BHundey Substation.jpg
Enerven / ElectraNet

Engineering & Design / Digital Engineering / CAD & Modelling / Reality Capture

CheethamSalt-PriceSaltField-low-1733283469.jpg
Cheetham Salt

Engineering & Design / Digital Engineering / CAD & Modelling / Reality Capture

SNoonan_WB_ARUP_070623_009-web.jpg
Arup

Training & Advisory

olympic-dam-villagfe,-south-australia.jpg
BHP

Engineering & Design / Digital Engineering / CAD & Modelling / Reality Capture

Major Works

  • Bundey-00.png
  • Bundey-03.png
  • Bundey-01.png
  • Bundey-02.png

south australia

Bundey Substation

DBS provided integrated digital engineering support across 2D drafting, detailed 3D modelling, model federation and technical visualisation, creating a coordinated digital environment to improve design understanding, collaboration and project delivery.

Outcome: Improved design coordination and project understanding through a clear, integrated digital engineering environment.
  • Robert-00.png
  • Robert-02.png
  • Robert-04.png
  • Robert-05.png

south australia

Robertstown Substation

DBS provided integrated digital engineering support for Robertstown Substation, combining 2D drafting, 3D modelling, LiDAR, GIS and model federation.

​

Multiple line, pole and tower arrangement options were developed to support design optioneering, bringing together civil, spatial and electrical engineering inputs to improve coordination and constructability.

Outcome: Enhanced multidisciplinary coordination and constructability through connected 2D, 3D and federated project information.
  • Murra-Warra-01.png
  • Murra-Warra-02.png
  • Murra-Warra-03.png
  • Murra-Warra-04.png

victoria

Murra Warra Windfarm

DBS provided integrated digital engineering support for Murra Warra Wind Farm, combining civil design, 3D modelling, LiDAR and point-cloud processing, model federation, construction visualisation and traffic simulations to improve site planning, coordination and constructability.

Outcome: Improved construction planning, site coordination and stakeholder understanding through integrated models, reality capture and visual simulations.
  • OD-01.png
  • OD-02.png
  • OD-03.png
  • OD-04.png
  • OD-05.png
  • OD-07.png
  • OD-08.png

south australia

Olympic Dam Substation

DBS provided integrated digital engineering support for the BHP Olympic Dam Substation 66kV yard upgrades, combining 2D drafting, detailed 3D modelling, LiDAR point cloud processing, model federation and visualisation.

​

Point cloud data was captured, registered, classified and cleansed before being federated with the 3D models to improve coordination, constructability and understanding of existing and proposed works.

​

DBS also produced project visualisations, stakeholder animations and a 4D construction timeliner to clearly communicate design intent, staging and construction sequencing.

​

Outcome: Enhanced multidisciplinary coordination and constructability through connected 2D, 3D and federated project information.
  • Cheetham-01.png
  • Cheetham-02.png
  • Cheetham-03.png
  • Cheetham-04.png

south australia

Cheetham Salts

DBS delivered integrated digital engineering support for the Cheetham Salt project in South Australia, combining 2D drafting, automated file translation and scripting, and detailed 3D modelling to streamline information exchange and improve the consistency of project outputs.

​

By reducing manual conversion effort and bringing legacy and current design information into coordinated digital formats, the work helped create a more efficient, reliable foundation for ongoing engineering and asset management.

Outcome: Improved design consistency and efficiency through coordinated 2D and 3D information, supported by automated file translation and streamlined digital workflows.
  • OD-BESS-01.png
  • OD-BESS-02.png
  • OD-BESS-03.png
  • OD-BESS-05.png

south australia

Olympic Dam BESS Project

DBS provided integrated digital engineering support for the Enerven / BHP Olympic Dam Solar Array project, combining detailed 3D modelling, 2D AutoCAD drafting, model coordination and visualisation.

​

The federated model was also used to develop project simulations, construction sequencing and stakeholder visualisations, helping communicate design intent, site interfaces and constructability across the solar array, substation and associated infrastructure.

Outcome: Improved design coordination, constructability and stakeholder understanding through a clear, integrated digital project environment.
bottom of page